(07) 4658 0600

Emerging springs a ‘success’ in the Great Artesian Basin

Dec 20, 2022GAB, News

We have been lucky enough to undertake the final monitoring on a very special project area north of Aramac.

Our ambitious goal was to stimulate long-dormant artesian springs that have dried up after a decline in Great Artesian Basin pressure over many decades in Western Queensland.

Conceived and funded by the Queensland Government under the Natural Resources Investment Program, DCQ has been working with landholders to manage these sites as they slowly recovered.

A big ask, and never previously attempted, but it has been a very successful project with over 23 springs now reflowing.

It’s been such a successful project that the work has been extended for a further two years under the Natural Resources Recovery Program, and this is why.

While 59 unique species were identified in initial biodiversity surveys of the springs, that number has now increased to 131 as sites stabilise and mature.

Of these, four are conservation listed species, and five of the springs now support endangered plants providing a massive increase in habitat.

Conservation alongside livestock

Landholders have embraced the arrivals of these emerging springs and are now carefully managing these sites.

It’s important to note that these sites are not in “conservation estates”, but rather are on working cattle and sheep properties. This demonstrates, again, the ability of landholders to manage the co-existence of production and conservation for the mutual benefit of both.

The lack of science on this side of the range (e.g. Western Queensland) means we don’t always realise the incredible life that we have access to right at our door step.

Fortunately, through projects like Emerging Springs and its extension, the science is catching up. At DCQ, we are very fortunate to have passionate people engaged in natural resource management who love the land on which we live and work.

Supported equally by graziers and scientists… now that’s work worth celebrating.

Natalie Spring Monitoring
Natalie Spring Monitoring

SEEDY BUSINESS

Sometimes, even mother nature needs a hand. Having perfected Prickly Acacia control, we have begun seeding work to “turbo charge” pasture recovery.

Camels prefer Prickly Acacia – but what’s the overall trend?

A preview of camel monitoring trials to control Prickly Acacia.

Photos: Fast-moving bushfires a ‘real possibility’ in Western Qld this season

The Qld Rural Fire Service is concerned fires will be more dangerous than usual.

How poly-pipe squares help assess land ‘bio-condition’ over time

A square plays a important role in capturing changes in NRM condition for several projects in the DCQ region.

Night parrot listed as ‘critically endangered’ as monitoring underway

An elusive, rare parrot in the Desert Channels region that was once thought to be extinct.

Free water quality testing of bores, springs in Western Queensland

Over the next 12 months, DCQ can test your bore or spring water quality at no cost.

Photos: Fast-moving bushfires a ‘real possibility’ in Western Qld this season

The Qld Rural Fire Service is concerned fires will be more dangerous than usual.

More funding to cap and pipe bores announced for Queensland

Up to 90% of your estimated eligible project costs could be covered. 

Emergency Plan

The BANC Emergency Preparedness and Response Plan outlines preparedness response and recovery actions for each asset with the aim of reducing the impact of catastrophic events.

Springs

Lying beneath parts of the Northern Territory, Queensland, South Australia, and New South Wales, the Great Artesian Basin, (GAB) is Australia’s largest groundwater basin and one of the largest underground freshwater resources in the world.

GAZING AND GRAZING INTO THE FUTURE

A project dedicated to assisting the progression of the grazing industry into the future is one that deserves close attention and support from all involved in the industry. One of 10 projects under the Queensland Government’s Drought and Climate Adaptation Program...

WATER QUALITY

This water quality project delivers a strategic approach to ensure clean water essential for community services. It also fosters improvements in waterway health.

Watertight

The Queensland Government has established the WaterTight program to be carried out by the Natural Resource Management groups

IS DIESEL BECOMING A THING OF THE PAST?

The increased cost of diesel, along with its health and environmental issues, has opened the door for a new kind of herbicide.

SEEDY BUSINESS

Sometimes, even mother nature needs a hand. Having perfected Prickly Acacia control, we have begun seeding work to “turbo charge” pasture recovery.

THORNVILLE QUANDARY

When pastures don’t return as expected.

THE TECH SAVY DESERT RAT

iPads are not just toys for us. They’ve become critical tools in recording our data and helping us to refine our mapping.

SUCCESS IN THE MAKING

With the summer rain, plants are now leaping out of the ground.